
New TopShim run:

version = topshim 2.0.0
date = 2024-07-01
time = 16:54:01.096
command = topshim 

FINE SHIMMING

Parameters:

probe = Z820201_0105
solvent = Acetone
shim nucleus = 2H
nucleus optimised for = 1H
o1p (from lock) = 2.04 ppm

Results:


1D Shimming:
Iteration  1: FWHM Before= 0.3 Hz, Target= 0.2 Hz, After= 0.5 Hz
Iteration  2: FWHM Before= 0.5 Hz, Target= 0.3 Hz, After= 0.4 Hz
Iteration  3: FWHM Before= 0.4 Hz, Target= 0.2 Hz, After= 0.3 Hz
Iteration  4: FWHM Before= 0.3 Hz, Target= 0.2 Hz, After= 0.3 Hz
Shim succeeded

Lineshape quality factor (1D spectrum, spinning) = 0.516

shim changes: 
Z	-190
Z2	-65
Z3	-29
Z4	+1299
Z5	-1156
Z6	-7699

duration = 1 min 4 sec
completed successfully
finished Mon Jul  1 16:55:03 2024


========================================================================
